We’ve been trying to clean
Today the stripers were in town placing the thermoplastic paint on a few of our newly paved roads. Normally I don’t get too involved in the operation because we have a project engineer. And technician inspecting and managing the project. But today, we had a resident call because she was concerned that. We had planned to stripe a crosswalk at a T-intersection. There had been one leg of a sidewalk connection with a depressed ramp on her side, but no connecting sidewalk on the other side of the road. these up and either remove the lone leg or add the other side. In this case we added the receiving ramp. Because the roadway is busy, the engineer had planned on placing a crosswalk at this point. However the resident was worried children would be harmed because the crosswalk might encourage them to cross there rather than further down at the 4-way stop.
I met the resident and her husband
At the site along with one of our policemen. Over the years I’ve found it to be a very valuable experience to work together with the police on traffic-related issues. They bring great insight and ideas. And in the india phone number end, they are the ones that have to regulate the traffic. The policeman who met me there is an awesome public safety professional who was able to offer his thoughts from a public safety perspective. He shared that we have crosswalks striped all over town at T-intersections, and the police have had no incidents reported.
Storm Sewer Project
We regularly receive calls related to stormwater issues throughout the community. Most of the time, they do not meet the criteria required for the city to install additional infrastructure. But occasionally the Mexico Phone Number water nuisance is extensive enough that we decide to construct an improvement. This year, we have plans to install a short segment of storm sewer to alleviate flooding that occurs over multiple properties after even a small amount of rainfall. Our crews will do the work so normally we would not prepare a normal set of plans required for bidding. But because we have some interns who are interested in learning CAD.